3D Kitchen Planner
Turn cabinet, worktop and appliance choices into a kitchen buyers can explore in 3D. Connect the design to your catalogue and quote workflow, with SAP pricing and order integration scoped to your systems.
Trusted by leading brands worldwide


What it does
A compelling design. A clearly defined path to quote.
Turn cabinet, worktop and appliance choices into a kitchen buyers can explore in 3D. Connect the design to your catalogue and quote workflow, with SAP pricing and order integration scoped to your systems.
- Explore room layouts, cabinet combinations and material choices in 3D
- Map selections to your real catalogue, quantities and units
- Apply the dimensional and product compatibility rules defined for your range
- Display indicative totals where a price source is connected
- Scope saved designs and dealer handoffs around your sales process
- Validate pricing, availability and order data before commercial acceptance
Capabilities
Built for products people obsess over
A purpose-built toolkit for visual commerce, not a generic 3D viewer with a checkout bolted on.
Materials & finishes
Present cabinet fronts, worktops and finishes using prepared 3D assets. On-screen colour is illustrative; physical samples remain the reference.
Room & modular planning
Define room measurements, openings and cabinet modules from your range. Accuracy depends on supplied geometry and verified site measurements.
Catalogue constraints
Model compatible sizes, clearances and product combinations. SAP LO-VC or AVC rules require a separately validated configuration integration.
Price-to-quote workflow
Connect a price source for indicative totals. Confirm customer terms, taxes, availability and delivery or installation charges before accepting an order.
Browser-based design review
Scope the experience for desktop and mobile browsers, with performance testing against your catalogue and chosen rendering approach.
Controlled SAP handoff
Keep SAP credentials server-side and agree permissions, validation, error handling and order-reference tracking for the chosen interfaces.
How it works
From data to launch in four steps
A guided rollout, your team brings the catalog, ours brings the pixels.
Define the range
Review CAD assets, room planning requirements, catalogue identifiers, units and price ownership.
Model the rules
Agree layout constraints, product dependencies and whether SAP or another service owns configuration validation.
Connect the workflow
Implement the storefront or dealer experience and agreed SAP interfaces in a test environment.
Validate & launch
Test representative designs, pricing, unavailable items and failed or duplicate handoffs before rollout.
Kitchen planning & SAP
From a kitchen design to a validated order
A kitchen plan describes room geometry and selected products. SAP holds the business data and processes configured for your organisation. Connecting the two is a scoped implementation, not an automatic feature of every planner.
Map the product selections
Map cabinets, worktops, appliances, quantities, units and finishes to product/material identifiers and, where applicable, configuration characteristics. Room coordinates are not automatically SAP order fields.
Check rules and commercial terms
Validate the selected products using the agreed rules authority. Request customer-specific pricing and availability through supported services; provisional totals are not confirmed quotations or delivery promises.
Submit with a traceable reference
Hand off through the agreed Commerce cart or ERP quotation/order interface, keeping credentials server-side. Handle validation errors and duplicate requests. A planner item list is not an approved manufacturing BOM; installation needs professional review.
SAP-side API access, permissions, middleware, configuration services and any additional licences must be confirmed during discovery. Scope and acceptance tests determine delivery dates.
Explore the SAP integration approachSAP technical references
These references document SAP interfaces, not a certified VisionThree connector. SAP product names are trademarks of SAP SE.
Where it shines
Where teams put this to work
Direct-to-consumer
Convert traffic with a self-serve kitchen configuration flow.
Sales & dealer tools
Equip reps and dealers with a unified kitchen configuration interface.
B2B & specifiers
Quote-ready kitchen configuration for trade, project and contract buyers.
Questions,
answered.
Everything you need to know to get started. Still curious? We're a quick conversation away.
Talk to our teamAvg. reply < 2h
Real humans, no bots
Can the kitchen planner connect to SAP?
+
Can the kitchen planner connect to SAP?
An integration can be assessed for your SAP products and releases. SAP Commerce Cloud cart workflows, S/4HANA ERP services and Business One Service Layer are distinct interfaces. Supported configuration, pricing and order functions must be confirmed during discovery; this is not a universal plug-and-play SAP connector.
Are the prices and stock figures guaranteed?
+
Are the prices and stock figures guaranteed?
No. Displayed totals may be indicative or cached, depending on the integration. Confirm customer-specific pricing, taxes, availability and any delivery or installation costs through the agreed business systems before issuing a binding quote or order.
Does a kitchen plan become a manufacturing BOM?
+
Does a kitchen plan become a manufacturing BOM?
Not automatically. A selected-product list is different from a manufacturing BOM. SAP configuration characteristics, BOM explosion and production approval require separately scoped interfaces and business validation.
Does the planner replace a professional site survey?
+
Does the planner replace a professional site survey?
No. Measurements, clearances, services, appliance requirements and installation safety must be checked by qualified professionals. A visual layout is not structural, electrical, gas or plumbing approval.
Can we use our existing catalogue and CAD?
+
Can we use our existing catalogue and CAD?
Existing data can be reviewed for onboarding. Geometry, materials, units, product identifiers and dependencies need preparation and mapping; supported formats and data refresh methods are confirmed for the project.
How long does implementation take?
+
How long does implementation take?
Timing depends on asset readiness, catalogue complexity, layout rules, SAP API access and the quote/order scope. A delivery plan is agreed after discovery and technical validation, rather than promised as a standard installation time.
See your kitchen live in 3D
Discuss your kitchen range, planning requirements and SAP landscape so we can define the right visual experience and integration scope.
